If you’ve been around the construction industry you’re likely familiar with the term “pre-construction”. Successful contractors know that proper planning sets the stage for a successful project. As the name indicates, any activities that need to take place before construction begins, fall into the category of preconstruction.
This article will dissect the preconstruction stage and dig deeper into each part of the process. So you can have all the necessary information at your fingertips when filling out the pre-construction checklist.
Preconstruction Checklist: Key Activities Carried Out During the Preconstruction Planning
A variety of activities need to happen before the formal start of the construction project. Not only will a preconstruction meeting (sometimes several) take place, but ongoing communication is critical to keep all involved parties in the loop.
Common activities on a construction checklist for the preconstruction phase include:
- Learning more about the client’s needs and requests
- Assessing the feasibility of the project
- Site evaluation
- Analyzing soil conditions
- Outlining the scope of work for the project
- Plan reviews
- Determining preconstruction cost estimation
- Finalizing financing details
- Signing contracts and work agreements
- Establishing a project timetable and setting up the target schedule
- Safety reviews
- Identifying a plan for communication
- Organizing services and utilities
- Identifying any potential issues that might come up
- Addressing any legal concerns
- Acquiring necessary permits to perform the work
Even though the general contractor oversees the construction project phases, this process is a collaborative effort to ensure the entire team’s success.
3 Distinct Construction Project Phases
Most construction projects can be broken down into three building construction phases, and there is a clear difference between preconstruction and the actual construction phases.
- Preconstruction Phase: Anything that needs to happen before construction begins must be included in the preconstruction phase. This planning and preconstruction phase establishes a strong foundation to help the main construction services move forward as needed.
- Construction Phase: Now it’s time for the physical construction to begin. This is the phase when heavy machinery moves on site, excavation is underway, and the building is going up. The construction phase is the most visible phase of the project.
- Post-Construction Phase: When construction is complete, the last phase is to finalize the site. This phase usually involves cleaning up, demobilizing, removing equipment from the site, and any other activities on the construction punch list that must be addressed before the project is handed over to the owner. Part of post-construction is often delivering documentation related to the project and training the owner on operating systems and equipment as needed.

Benefits of Preconstruction Services: Save Time and Money
Successful preconstruction planning has an undeniable impact on saving both time and money on a project. For example, when the preconstruction team predicts the size of the structure and estimates the materials that will be needed, then it’s easier to streamline the purchasing and lock in the best pricing.
Additionally, pre-construction planning can effectively reduce labor costs by avoiding last-minute changes and minimizing the risk of delays. Strategies can also be implemented to optimize material usage, which helps reduce waste and manage overall materials expenses.
It’s easy to see that preconstruction can be one of the most important steps in the project to ensure that your team stays on schedule and that you are sticking with the outlined budget. Decisions made during preconstruction will have a long-lasting impact on the entire project.
Other benefits of preconstruction services include:
- Effective communication between all parties involved
- Accurately recording construction cost estimates to maintain the budget
- Ensuring optimal productivity through every stage of construction
- Improving quality oversight and control
- Reducing waste and decreasing the risk of rework expenses
- Identifying risks as early as possible to support safety on-site
- Avoiding environmental damage during the construction work
- Minimizing the impact on neighboring properties
Undoubtedly, preconstruction is a critical phase to support the overall project. When a solid foundation is in place, the planning and construction can move forward successfully.
Construction Scheduling Software in Preconstruction